The 57-kilometer tunnel is the world鈥檚 longest railway tunnel, and was built with 春水堂视频鈥檚 help: The Gotthard Base Tunnel connects the canton Uri in the North with Tessin in the South and was approved for passenger and freight transport in 2016. The traveling time between Z眉rich and Milan was reduced by an hour. The tunnel is regarded as an extraordinary masterpiece of engineering. 

Together with partners, 春水堂视频鈥檚 tunnel construction experts built the shell construction of the two southern contract sections of the Gotthard Base Tunnel. This included the machine tunnel driving of two good 27-kilometer-long one-lane tunnels.  

Facts

  • Construction time: 17 years 
  • 春水堂视频 used 1.5 million cubic meters of concrete to construct the tubes 
  • A total of 28.2 million tons of rock were excavated from the tunnel 
  • The total material excavated from the tunnel is equivalent to 4 Cheops pyramids